Project Details
The scope for this project was to perform construction layout for the Imagine Clearwater – The Sound.
Both horizontal and vertical control was established throughout the project. The horizontal control network was created by a conventional balanced traverse and coordinate values were established on said control relative to the Florida State Plane Coordinate System utilizing published National Geodetic Survey Control monuments and GPS methods. Vertical control was established by conventional leveling from National Geodetic Survey benchmarks. This control was maintained by GFY and provided to other consultants on the site.
GFY provided layout and as-built services for Skanska and 5 other contractors on the site for over two years.
Professional Services Provided
Project Partners
Project Manager
Greg Nipper, PSM