GFY provided civil engineering, surveying, subsurface utility engineering, and maintenance of traffic services for the new museum during its transformation.
GFY provided civil engineering services for the renovation of the Blue Jays Spring Training Stadium in Dunedin, FL. The $50 million project included updating Dunedin Stadium both in terms of capacity and amenities.
The project involved the demolition and reconstruction of two of the minor league playing fields and the demolition of five of the remaining fields, with a single field located in the southwest corner of the property remaining untouched.
The project included the demolition of the existing 108,000 +/-Roosevelt Building and the construction of a new 170,000 SF +/-Building (New Roosevelt Building). The adjacent 7.23-acre parcel previously occupied by Tampa Bay Research Institute was added to the Jabil Campus Site plan.
The site located at 2100 Gandy Blvd. in St. Petersburg, Florida, will be developed into a car condominium or high-end car warehouse/storage with 300 car garages and a high-performance driving track.
GFY provided civil design services for the 116k sf expansion project of an existing 133k Halkey-Roberts manufacturing facility. The project site is approximately 11.04 +/-acres.