Jabil Campus Replacement

Project Details

The project included the demolition of the existing 108,000 +/-Roosevelt Building and the construction of a new 170,000 SF +/-Building (New Roosevelt Building). The adjacent 7.23-acre parcel previously occupied by Tampa Bay Research Institute was added to the Jabil Campus Site plan. The improvements to this parcel included the renovation of the existing building and an 8,000 SF +/- building addition. Post development also includes the addition of two wet detention ponds and the redesign of the parking layout, islands, drive aisles, and an outdoor gathering area. The existing four-story general service building located just south of the proposed new building will also be renovated. The parking layout will be reconfigured, and a new signalized entrance drive will be added.

Professional Services Provided

Civil Engineering
Construction Engineering Inspection
Survey & Mapping
Laser Scanning
Subsurface Utility
Traffic Engineering
Landscape Architecture
Ecology

Project Partners

Gensler, Rockfon, Skanska USA Building, Inc., OCI Associates
Clients: Jabil Inc.
Location: St. Petersburg, Florida
Date: June 09, 2020

Project Manager

Tim Rankin, PE



Now Hiring ALL POSITIONS!

GFY JOBS